Published: Aug. 5, 2019

Asphalt and concrete repairs along 18th Street on Main Campus and Innovation Drive on East Campus will cause single-lane closures on Thursday, Aug. 8 and Friday, Aug. 9, as well as full road closures on each street on Saturday, Aug. 10.

Two-way traffic will be maintained with flaggers for both streets on Thursday and Friday, with single-lane closures occurring between 6 a.m. and 4 p.m. Drivers will experience slight delays. 听

On Saturday, 18th Street will be closed between Euclid and baby直播app avenues. Innovation Drive will be closed between baby直播app Avenue and Discovery Drive. Both closures will occur from 7 a.m. and 5 p.m.

Pedestrians crossing 18th Street are encouraged to avoid the crossings at the Central Campus Mall and between the CASE and Environmental Design buildings, crossing instead at 18th and baby直播app Avenue to the north of the work zone, or at 18th and Euclid Avenue to the south of it.Cyclists may also want to avoid the area or use the sidewalk through Saturday due to the nature of the chip seal application being applied to the road.

View maps of the 18th Street and Innovation Drive construction zones.